
Bridge Engineering
Rail Bridge over Dhansiri River
Sukhovi, NagalandNorth East Frontier Railway

Fabrication & Installation of the Steel Structure including Side Pathway The work was delivered for North East Frontier Railway at Sukhovi, Nagaland during 2024–2025.
Fabrication & Installation of the Steel Structure including Side Pathway